home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / DAILY_1 / 921221.DFC < prev    next >
Text File  |  1992-12-22  |  8KB  |  234 lines

  1. 21-Dec-92 Daily File Collection
  2.    These files were added or updated between 20-Dec-92 at 21:00:00 {Central}
  3.                                          and 21-Dec-92 at 21:00:22.
  4.  
  5. =--=--=START=--=--= NASA Spacelink File Name:921221.REL
  6.  
  7.  NOTE: This file is too large {66031 bytes} for inclusion in this collection.
  8.     The first line of the file:
  9.  
  10. 12/21/92: 1992 SEEN AS NASA'S MOST PRODUCTIVE YEAR FOR SCIENCE DISCOVERIES
  11.  
  12.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  13. =--=--=-END-=--=--=
  14.  
  15. =--=--=START=--=--= NASA Spacelink File Name:921221.SHU
  16.  
  17. KSC SHUTTLE STATUS REPORT 12/21/92
  18.  
  19.  
  20.  
  21.           SPACE SHUTTLE STATUS REPORT
  22.              Kennedy Space Center, Florida
  23.  
  24.               Monday, December 21, 1992
  25.  
  26.  
  27. George H. Diller
  28.  
  29.  
  30. Vehicle: OV-105/Endeavour   Mission Number: STS-54
  31. Location: Launch Pad 39-B
  32. Primary Payload: TDRS-F/IUS-13 + Diffuse X-ray Spectrometer (DXS)
  33. Launch Timeframe: NET January 13
  34. Mission Duration: 5 Days 23 Hours 33 Minutes
  35. Inclination: 28.45 degrees   Crew Size: 5
  36. Nominal Landing Site: KSC
  37.  
  38. IN WORK TODAY:
  39.  
  40. - IUS ordnance installation
  41. - IUS flight battery installation
  42. - Space Shuttle vehicle ordnance installation
  43. - aft compartment closeouts
  44. - preparations for holiday work suspension/holiday outages
  45.  
  46.  
  47. WORK COMPLETED:
  48.  
  49. - IUS Flight Readiness Checks
  50. - retest IUS Range Safety hold-fire circuit
  51. - calibration of inertial measurement units
  52. - crew cabin and aft compartment cleaning
  53. - avionics bay closeouts
  54. - aft main engine compartment confidence test
  55.  
  56.  
  57. WORK SCHEDULED:
  58.  
  59. - Flight Readiness Review on Tuesday
  60. - close payload bay doors for the holidays on Tuesday night
  61. - power down Space Shuttle vehicle for the holidays on Wednesday
  62.  
  63.  
  64.  
  65. SPECIAL TOPICS:
  66.  
  67.      OV-103/Discovery atop the 747 Shuttle Carrier Aircraft arrived at KSC at
  68. 2:41 p.m.  EST on Friday. It was demated from the 747 and arrived at OPF Bay 3
  69. at 7:25 a.m. on Saturday. The orbiter has been jacked and leveled.  The forward
  70. reaction control system (FRCS) has been removed and is to be transported to the
  71. Hypergolic Maintenance Facilty (HMF) today.  Also in work today is the removal
  72. of the ferry flight tail cone.  The payload bay doors are being opened for
  73. removal of the airborne support equipment which will be followed by
  74. troubleshooting of ODERACS.
  75.  
  76.      In the Vehicle Assembly Building, STS-55 solid rocket booster stacking and
  77. leak checks of the left and right boosters was successfully completed on
  78. Saturday. Joint closeouts are in work.  Mating the external tank is scheduled
  79. to occur when work resumes after the Christmas holidays.
  80.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  81. =--=--=-END-=--=--=
  82.  
  83. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_42_2_3.TXT
  84.  
  85. STS-54 QUICK LOOK FACTS
  86.  
  87.  
  88. Launch Date/Site:       Jan. 13, 1993/Kennedy Space Center, Fla. -- Pad 39B
  89.  
  90. Launch Time:            8:52 a.m. EST
  91.  
  92. Orbiter:                Endeavour (OV-105) - 3rd Flight
  93.  
  94. Orbit/Inclination:      160 nm/28.45 degrees 
  95.  
  96. Mission Duration:       5 days, 23 hours, 32 minutes, 00 seconds
  97.  
  98. Landing Time/Date:      8:34 a.m. EST, Jan. 19, 1993
  99.  
  100. Primary Landing Site:   Kennedy Space Center, Fla.
  101.  
  102. Abort Landing Sites     Return To Launch Site Abort:  KSC, Fla
  103.                         TransAtlantic Abort Landing:  Banjul, The Gambia
  104.                               Ben Guerir, Morroco 
  105.                                                       Moron, Spain
  106.                     Abort-Once-Around:            Edwards AFB, Calif.
  107.                                                       KSC/White Sands 
  108.  
  109. Crew:                   John Casper - Commander
  110.             Don McMonagle - Pilot
  111.                         Mario Runco, Jr. - MS1 (EV2)
  112.                         Greg Harbaugh - MS2 (EV1)
  113.                         Susan Helms - MS3
  114.                                                 
  115. Cargo Bay Payloads:     Tracking and Data Relay Satellite-F
  116.                         Diffuse X-ray Spectrometer 
  117.  
  118. Middeck Payloads:       Commercial Generic Bioprocessing Apparatus 
  119.                         Chromosome and Plant Cell Division in Space Experiment 
  120.                         Physiological and Anatomical Rodent Experiment 
  121.                         Space Acceleration Measurement System 
  122.                         Solid Surface Combustion Experiment
  123.  
  124.  
  125. STS-54 SUMMARY TIMELINE
  126.  
  127. Flight Day One
  128.  
  129. Launch/post insertion
  130. TDRS-F deploy (nominal deploy is 6 hours, 13 minutes MET)
  131. Separation burn (178 n.m. x 162 n.m. orbit)
  132. DXS activation
  133.  
  134. Flight Day Two
  135.  
  136. DXS operations
  137. Circularization burn (162 n.m. x 162 n.m. orbit)
  138. CGBA operations
  139. Medical DSOs
  140.  
  141. Flight Day Three
  142.  
  143. DXS operations
  144. CGBA operations
  145. SSCE operations
  146. CHROMEX/PARE operations
  147.  
  148. Flight Day Four
  149.  
  150. DXS operations
  151. CGBA operations
  152. Medical DSOs
  153. CHROMEX/PARE operations
  154.  
  155. Flight Day Five
  156.  
  157. DXS operations
  158. EVA
  159.  
  160. Flight Day Six
  161.  
  162. Flight Control Systems checkout
  163. Cabin stow
  164.  
  165. Flight Day Seven
  166.  
  167. Deorbit Preparation
  168. Deorbit Burn
  169. Entry
  170. Landing
  171.  
  172.  
  173. STS-54 VEHICLE AND PAYLOAD WEIGHTS
  174.  
  175. Vehicle/Payload                                         Pounds
  176.  
  177. Orbiter (Endeavour) Empty and three SSMEs              173,174
  178.  
  179. Tracking and Data Relay Satellite-F (TDRS-F)             5,586
  180.  
  181. Two-Stage Inertial Upper Stage (IUS)                    32,670
  182.  
  183. Diffuse X-ray Spectrometer (DXS)                         2,625
  184.  
  185. Medical Detailed Supplementary Objectives (DSOs)            34
  186.  
  187. Total Vehicle at Solid Rocket Booster Ignition       4,525,222
  188.  
  189. Orbiter Landing Weight                                 205,000
  190.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  191. =--=--=-END-=--=--=
  192.  
  193. =--=--=START=--=--= NASA Spacelink File Name:6_8_3_4_41.TXT
  194.  
  195. MGN STATUS 12/21
  196.  
  197. Magellan Status
  198.  
  199. Status Report of Magellan for Monday, December 21, 1992:
  200.  
  201. 1.  The Magellan spacecraft continues to operate normally, performing
  202. a starcal and desat in each 3-hour orbit and transmitting a carrier
  203. signal (plus X-band telemetry) which is precisely tracked by the DSN
  204. stations to extract gravity data.
  205.  
  206. 2.  On Sunday, December 20, the spacecraft performed the second radio
  207. science experiment of recent weeks on orbits #6471 and 6472.  As the
  208. spacecraft passed behind Venus (as viewed from Earth), Magellan
  209. performed a limb-tracking maneuver on both ingress and egress.  In
  210. this way, the received signal passed through the atmosphere of Venus
  211. as it was refracted around the limb.
  212.  
  213. 3.  By measuring the attenuation and doppler shift of both the S- and
  214. X-band carrier signals, scientists can study the relative abundances
  215. of H2SO4 (sulfuric acid) and CO2 (carbon dioxide), as well as other
  216. measures of the atmosphere.
  217.  
  218. 4.  Following the radio science experiment, controllers turned on the
  219. 360 kHz subcarrier and performed a Very Long Baseline Interferometry
  220. (VLBI) experiment for two orbits.  Then the spacecraft was commanded
  221. back to the carrier plus X-band mode.
  222.  
  223. 5.  Spacecraft temperatures remain in the expected range: Bay 7 is 48
  224. deg. C. and Transmitter B is at 51.2 deg. C, with a cycle depth of 1.5
  225. deg.  The commanded position of the Solar Array Drive Mechanism will
  226. be updated today in preparation for the holiday period.
  227.  
  228. 6.  The spacecraft has completed 6367 orbits of Venus; 731 so far in
  229. Cycle-4, which will end on May 25, 1993.  Cycle-4 is 39.5% complete.
  230.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  231. =--=--=-END-=--=--=
  232.  
  233. =--=END OF COLLECTION---COLLECTED 4 FILES---COMPLETED 21:04:57=--=
  234.